Dry verge systems

Mortar-free verge units fitted to protect and finish exposed roof edges.

Dry verge systems.

Interlocking dry verge units replace exposed mortar at the edge of a tiled roof. The units are selected to suit the tile and fixed to provide a secure, consistent finish.

  • Mortar-free roof edge
  • Secure mechanical fixing
  • Colour options
  • New and existing tiled roofs
Dry verge systems completed by JDL Roofing

The roof decides the specification.

Condition, roof shape, exposure, drainage, access and the surrounding details all affect the work required. JDL inspects those factors before confirming the scope.

How the work is completed.

The detailed method follows the agreed specification. These are the main stages.

Inspect the verge

Establish the condition, priorities and access before work is specified.

Remove failed mortar

Confirm the system, materials and practical arrangements in writing.

Prepare the roof edge

Complete the agreed work methodically and keep the property protected.

Fit and check each unit

Inspect the completed work and confirm the applicable terms.

10-year guarantee on eligible dry verge installations.

The written quotation confirms the system, included work and the complete guarantee terms for the specified project.

Read the guarantee information

Common questions.

How do I know whether I need dry verge?

Start with the problem you can see and how urgent it is. JDL will assess the roof, relevant details and access before setting out the appropriate work.

Can photographs help with the first assessment?

Yes. Ground-level or safely taken photographs can provide useful context. A final specification may still require an on-site roof survey.

What will the quotation include?

The written quotation sets out the proposed work, principal materials and the guarantee terms that apply to the specified work.

How soon will I receive my roofing quote?

After the site visit, JDL sends your written quotation within 48 hours. Most are sent within 24 hours.