Condition survey
Establish the condition, priorities and access before work is specified.

Full roof renewal when repairs are no longer the right long-term option.
A re-roof removes the existing covering so the roof build-up, battens, underlay, ventilation and junctions can be renewed as one coordinated system. JDL will first assess whether targeted repair or complete renewal is appropriate.
A closer look at roof renewal and the work beneath the finished covering.
New slate roofing alongside re-roofing using existing Welsh slates, from preparation to the renewed roof covering.

Latest York case study
See the failed roof covering, new membrane and battens, and the completed tiled roof across 15 before, during and completed photographs.
View the roof replacement
Condition, roof shape, exposure, drainage, access and the surrounding details all affect the work required. JDL inspects those factors before confirming the scope.
The detailed method follows the agreed specification. These are the main stages.
Establish the condition, priorities and access before work is specified.
Confirm the system, materials and practical arrangements in writing.
Complete the agreed work methodically and keep the property protected.
Inspect the completed work and confirm the applicable terms.
Your written terms
10-year guarantee on eligible re-roofing work.
The written quotation confirms the system, included work and the complete guarantee terms for the specified project.
Read the guarantee informationA re-roof removes the existing covering so the battens, underlay, ventilation and roof junctions can be considered together. JDL checks the roof structure and confirms the renewal scope in writing.
Yes. JDL first assesses whether a targeted repair or complete renewal is appropriate. Full re-roofing is considered when repairs are no longer the right long-term option.
Yes. Ground-level or safely taken photographs can provide useful context. A final specification may still require an on-site roof survey.
After the site visit, JDL sends your written quotation within 48 hours. Most are sent within 24 hours.