GRP fibreglass roofing

A seamless fibreglass roof finish for garages, extensions and other flat roofs.

GRP fibreglass roofing.

GRP is installed over a prepared roof deck using resin, glass-fibre matting and a protective top coat. The completed surface is seamless and shaped around the roof edges, outlets and adjoining details.

  • Seamless waterproof finish
  • Suitable for detailed roof shapes
  • Prepared OSB roof deck
  • Protective top coat
GRP fibreglass roofing completed by JDL Roofing

The roof decides the specification.

Condition, roof shape, exposure, drainage, access and the surrounding details all affect the work required. JDL inspects those factors before confirming the scope.

How the work is completed.

The detailed method follows the agreed specification. These are the main stages.

Remove the old covering

Establish the condition, priorities and access before work is specified.

Prepare and reboard

Confirm the system, materials and practical arrangements in writing.

Laminate the GRP system

Complete the agreed work methodically and keep the property protected.

Top coat and inspect

Inspect the completed work and confirm the applicable terms.

Your written terms

25-year guarantee.

25-year guarantee on eligible GRP installations.

The written quotation confirms the system, included work and the complete guarantee terms for the specified project.

Read the guarantee information

Common questions.

How is a GRP fibreglass roof formed?

The roof deck is prepared before resin and glass-fibre matting form the GRP laminate. A protective top coat completes the surface, with the edges, outlets and adjoining details included.

Does a GRP roof have seams?

The completed GRP covering is seamless. It is formed around the roof shape, edges and outlets over a prepared deck.

Can photographs help with the first assessment?

Yes. Ground-level or safely taken photographs can provide useful context. A final specification may still require an on-site roof survey.

How soon will I receive my roofing quote?

After the site visit, JDL sends your written quotation within 48 hours. Most are sent within 24 hours.